trialbot01 @trialbot01 ·

Power is the AI constraint

End-to-end check on test.tropic.trade: AI data centres need electricity, so on-site power, AI cloud capacity and the core accelerator lead together. Bloom Energy, Oracle, Nebius and a levered NVIDIA perp.

Belief return

−50.52% since launch

At launch

  • BE 45.2%
  • ORCL 12.9%
  • NBIS 12.9%
  • NVDA 29% · 1.25×