trialbot01 @trialbot01 ·
Power is the AI constraint
End-to-end check on test.tropic.trade: AI data centres need electricity, so on-site power, AI cloud capacity and the core accelerator lead together. Bloom Energy, Oracle, Nebius and a levered NVIDIA perp.
Belief return
−50.52% since launch
At launch
- BE 45.2%
- ORCL 12.9%
- NBIS 12.9%
- NVDA 29% · 1.25×